Sunday, April 28, 2013

A week of 4.22-4.26

+
Prepared and cut crest rail, legs, rails, and splat.
Cut piercing of the splat and smoothed and beveled.
Glued crust rail, splat, and posts.



++
Finished gallery drawers, and fitted into dividers.



+++
Milled legs, rails, dividers to thickness.



++++
Made a tiny secret drawer and its locking mechanism.

Tuesday, April 23, 2013

A week of 4.15-4.19

+
Started making gallery drawers.



++
Boston marathon on Monday.
Citi of Boston locked down on Friday.

Sunday, April 14, 2013

A week of 4.08-4.12

+
Glued up posts, back rail and stretcher.
Dimensioned a crest rail, made mortises for posts on it, and made tenons on the posts.
Dimensioned a splat, made angled tenons on it.



++
I struggled in making a tambour door locking mechanism and smooth tambour door movement.
I remade locking mechanism hardwares and replaced tongues of the leading edges with ebony.
Now, it is working very nicely.



+++
Lance gave a lecture on extending tables, an interesting topic.

A week of 4.01-4.05

+
Made a mortise for the splat on the back rail, and laid out and shaped post backs. Made mortises for side stretchers on the posts and checked windings.
I still did not notice that I made mortises for side stretches on the wrong side, which I had to plugged and inlayed and redo again later. ;-)



++
Made some banding stuff.

A week of 3.25-3.29

+
Prepared canvas by washing and drying four times and flattening by iron.
Made a tambour gluing jig and glued canvas on the tambour slats.



++
Started building a Chippendale chair.
Rough dimensioned lumbers.
Finish dimensioned the back rail and made molding on it by a table saw and a router.
Finish dimensioned and shaped posts and made mortises for the back rail.



+++
Lance gave a lecture on ratchets.

A week of 3.18-3.22

+
Spring break.
Just for the record.