Prepared and cut crest rail, legs, rails, and splat.
Cut piercing of the splat and smoothed and beveled.
Glued crust rail, splat, and posts.
++
Finished gallery drawers, and fitted into dividers.
+++
Milled legs, rails, dividers to thickness.
++++
Made a tiny secret drawer and its locking mechanism.
Sunday, April 28, 2013
Tuesday, April 23, 2013
A week of 4.15-4.19
Sunday, April 14, 2013
A week of 4.08-4.12
+
Glued up posts, back rail and stretcher.
Dimensioned a crest rail, made mortises for posts on it, and made tenons on the posts.
Dimensioned a splat, made angled tenons on it.
++
I struggled in making a tambour door locking mechanism and smooth tambour door movement.
I remade locking mechanism hardwares and replaced tongues of the leading edges with ebony.
Now, it is working very nicely.
+++
Lance gave a lecture on extending tables, an interesting topic.
Glued up posts, back rail and stretcher.
Dimensioned a crest rail, made mortises for posts on it, and made tenons on the posts.
Dimensioned a splat, made angled tenons on it.
++
I struggled in making a tambour door locking mechanism and smooth tambour door movement.
I remade locking mechanism hardwares and replaced tongues of the leading edges with ebony.
Now, it is working very nicely.
+++
Lance gave a lecture on extending tables, an interesting topic.
A week of 4.01-4.05
+
Made a mortise for the splat on the back rail, and laid out and shaped post backs. Made mortises for side stretchers on the posts and checked windings.
I still did not notice that I made mortises for side stretches on the wrong side, which I had to plugged and inlayed and redo again later. ;-)
++
Made some banding stuff.
Made a mortise for the splat on the back rail, and laid out and shaped post backs. Made mortises for side stretchers on the posts and checked windings.
I still did not notice that I made mortises for side stretches on the wrong side, which I had to plugged and inlayed and redo again later. ;-)
++
Made some banding stuff.
A week of 3.25-3.29
+
Prepared canvas by washing and drying four times and flattening by iron.
Made a tambour gluing jig and glued canvas on the tambour slats.
++
Started building a Chippendale chair.
Rough dimensioned lumbers.
Finish dimensioned the back rail and made molding on it by a table saw and a router.
Finish dimensioned and shaped posts and made mortises for the back rail.
+++
Lance gave a lecture on ratchets.
Prepared canvas by washing and drying four times and flattening by iron.
Made a tambour gluing jig and glued canvas on the tambour slats.
++
Started building a Chippendale chair.
Rough dimensioned lumbers.
Finish dimensioned the back rail and made molding on it by a table saw and a router.
Finish dimensioned and shaped posts and made mortises for the back rail.
+++
Lance gave a lecture on ratchets.