+ Handrails
Handrails were installed.
Building work was going very slowly, however approaching to the end eventually.
Saturday, November 15, 2014
Thursday, November 13, 2014
Wednesday, November 12, 2014
A note on 11.12
+ Finishing aluminium walls
The aluminium panel walls were finished by caulking.
++ Landscaping work
Landscaping work was done on the rooftop and the ground.
+++ Turf block
Turf blocks were laid to create driveways.
The aluminium panel walls were finished by caulking.
++ Landscaping work
Landscaping work was done on the rooftop and the ground.
+++ Turf block
Turf blocks were laid to create driveways.
Friday, November 7, 2014
Wednesday, November 5, 2014
Saturday, November 1, 2014
A note on 11.01
+ Cleaning land
An excavator, a.k.a. poclaine cleaned land.
++ Windows and doors
Windows and doors were installed.
+++ Wooden floors
Wooden floors were installed and covered with papers.
An excavator, a.k.a. poclaine cleaned land.
++ Windows and doors
Windows and doors were installed.
+++ Wooden floors
Wooden floors were installed and covered with papers.