Friday, April 20, 2012

A week of 04.16-04.20

+
Cut curved sides of bricks on a bandsaw.

++
Cut angled ends of bricks on a table saw.

+++
Gled up bricks to make a front apron.

++++
Surface of front apron was smoothed on a shaper(no photo).
Cut tenon ends of front apron on a table saw.

+++++
Cut bridle joints of front legs. The legs were screwed to the jig.

++++++
Lance gave a lecture and demonstration on barley twist.
The concentration of old master on a risky job was impressed and beautiful to watch.
Juan tried to manipulate the post Lance cut on a table saw.

+++++++
Veneer(Satinwood, and Mahogany as backing) were prepared, veneer pressed(no photo), and glued-up on front apron.

++++++++
Veneered front apron were trimmed and table top boards were glued up.

Sunday, April 15, 2012

A week of 04.09-04.13

+
Exercise was done.
I'll start a real turning and reeding.

++
A lecture by Lance on wood rings.

+++
I spent a lot of time on turning exercise.
Turning is a risky job.
I realized that understanding wood grain is the most important in turning.
Turning and Reeding of four legs were done.
I am ready for the next stage.




A week of 04.02-04.06

+
I was a little sick, absent from the school two days.
For the record...

Saturday, March 31, 2012

A week of 03.26-03.30

+
The drawing for the next project was approved.
Lumber was rough milled and stickered.
I was working on writing procedure proposal.


++

The turning tools were horned and index bars for exercise and project were prepared.
I am ready for practice and turning.

Sunday, March 25, 2012

A week of 03.19-03.23

+
Bracket Feet, another lecture by Lance.


++
I brought lumber for my future projects, #2-#4. ;-)

+++
My #2 project drawing, Circular Console Table.

Wednesday, March 21, 2012

Saturday, March 10, 2012

A week of 03.05-03.09

+
A candle box, a proficiency test.
Total machine room hours are 1 hour and 40 minutes, total bench room hours are 17 hours and 20 minutes, summing up to 19 hours.
A long way to go to be really proficient.