Saturday, November 15, 2014

A note on 11.16

+ Handrails

Handrails were installed.

Building work was going very slowly, however approaching to the end eventually.




Thursday, November 13, 2014

A note on 11.13

+ Just a couple of shots

Nothing much today. Just a couple of shots of the building.




Wednesday, November 12, 2014

A note on 11.12

+ Finishing aluminium walls

The aluminium panel walls were finished by caulking.




++ Landscaping work

Landscaping work was done on the rooftop and the ground.








+++ Turf block

Turf blocks were laid to create driveways.


Friday, November 7, 2014

Wednesday, November 5, 2014

A note on 11.06

+ Epoxy floor

The epoxy floor was made.




++ Stairs

Stairs and stair area ceiling were made.


Saturday, November 1, 2014

A note on 11.01

+ Cleaning land

An excavator, a.k.a. poclaine cleaned land.



++ Windows and doors

Windows and doors were installed.


+++ Wooden floors

Wooden floors were installed and covered with papers.


Thursday, October 30, 2014

A note on 10.31

+ Exterior work

Stucco was applied to the surfaces of the building. Insulation material was attached to the lightweight steel structured walls. Scaffolding was removed.








++ Painting

Inside walls was painted.




+++ Manholes and drain pipes

Manholes for water, electricity, communication were made. Drain pipes were installed.








++++ Epoxy floor

Self-leveling mortar was coated to make the base of the epoxy floor.