+ Exterior work

Stucco was applied to the surfaces of the building. Insulation material was attached to the lightweight steel structured walls. Scaffolding was removed.








++ Painting

Inside walls was painted.




+++ Manholes and drain pipes

Manholes for water, electricity, communication were made. Drain pipes were installed.








++++ Epoxy floor

Self-leveling mortar was coated to make the base of the epoxy floor.