+
We started this week by installing runners and kickers.
I had a non square drawer opening, therefore needed two different blocks for install kickers parallel to runners.
++
We all sweated by making a drawer.
I wasted 3 drawer sides, and had to ask Bob for lumber.
Lessons were learned from mistakes, though.
+++
I managed to finish the drawer, drawer bottom, and the top.
Now, remaining things are fitting drawers, installing the top, and turing the drawer pull, which will be done next week.
++++
A NBSS way of preparing for Christmas.
I entertained an idea of making a puzzle for a Christmas present, but quickly gave it up. ;-)
No comments:
Post a Comment