Sunday, September 23, 2012

A week of 09.17-09.21

+
A week of a machine maintenance workshop.
Matt gave the instruction and 13 students(Alta, Nathalie, David, Paul, James, Ben, Nick, Evan, Matt(2), Grant, Lisa, Annette, and me) worked together to set up machines.
A little crowded but very helpful. However my bench time was very limited because of it.



++
The center inlay of the candle stand was made.
Edge banding was glued up.
Cove along the underneath of the edge was made.
The center inlay was applied.
The oval top was almost finished.

I'll address the pop-out problem of the redwood veneer by shellac stick next week.



+++
Moldings of the bookcase that needed a shaper was done.
Side moldings of the door was cut to length and mitered at the both ends and to the center moldings.