Monday, February 20, 2012

A week of 02.13-02.17

+
The front drawer pins were made, drawer side front tails were made and fitted, grooves for drawer bottoms were made, and drawer backs were prepared.



++
Lance and Dan gave lectures on lathe and grinder safety.



+++
The drawer back pins were made, drawer side back tails were made and fitted.
Drawers were successfully glued up.
One drawer needed to be adjusted by a heat lamp though.


++++
Drawer bottoms were fitted, and drawers were fitted to the case, and can be smoothly pulled out by tape pulls.
I gave 0.02" opening on the top and 0.01" opening on the sides, which could be enough for seasonal and mechanical movement.



Sunday, February 12, 2012

A week of 02.06-02.10

+
I prepared a drawer guide which had been lost during the moving, and glued in it with the help of a story stick.

++
The drawer font stocks were prepared, which were cut from the same lumber in the order in order to match grains.


I planed them smooth and custom-fit them to the spaces.



+++
Dan reported his participation of the Colonial Williamsburg Conference in the backbench room.


++++
Making front drawer pins.


+++++
Glued drawer bottoms and planed them smooth.

Wednesday, February 8, 2012

Project No. 0, Shaker Night Stand

+
My first project.
Since it is not called as a project here, it could be better termed as the last exercise piece of the CFM of NBSS.















Sunday, February 5, 2012

A week of 01.30-02.03

+
I made dados and rabbets on a table saw(plunge and stop cut) by the help of Lance.

Made the squared stop of dados and cleaned the dados by a router plane.

Checked the squareness of the case by combination squares on the dry-fitted case.

No photos, but struggled to glue the case. ;-)

++
I made mortise and tenon joints of the divider frames on a router and a table saw by the help of Lance.
Also made brakets on a bandsaw and glued them up on the top divider frame, and cut made the door stop and drawer runners.
The divider frames were glued up.

The divider frames were fitted to the dados.

+++
Lance gave a lecture on desks.
Lance's lecture normally takes more an hour.
This one was rather short, taking 45 minutes.


++++
The night before the moving day.
Memories will remain.


+++++
The moving day.
The back bench room was being evacuated.


A new room.
Bob, Nathalie, Vince, Jeff, Cris, Paul, Rich, David and I will be here with a Jeff in the 3rd semester.
Boyd, Charles, Marie, James will move into the other room.

Issac was moving his stuffs.

It's my new workbench.

++++++
I made dados for the vertical partition.

Made notches so that the vertical partition could slide in the dados.

Made dovetails of the vertical partition using a chisel and a ramp block.

Transferred the dovetail lines of the vertical partition on the rails and made the sockets.

The dovetailed vertical partition was fitted into the sockets and dados of the rails.

I glued divider frames, a door stop, and drawer runners.