Saturday, November 15, 2014

A note on 11.16

+ Handrails

Handrails were installed.

Building work was going very slowly, however approaching to the end eventually.




Thursday, November 13, 2014

A note on 11.13

+ Just a couple of shots

Nothing much today. Just a couple of shots of the building.




Wednesday, November 12, 2014

A note on 11.12

+ Finishing aluminium walls

The aluminium panel walls were finished by caulking.




++ Landscaping work

Landscaping work was done on the rooftop and the ground.








+++ Turf block

Turf blocks were laid to create driveways.


Friday, November 7, 2014

Wednesday, November 5, 2014

A note on 11.06

+ Epoxy floor

The epoxy floor was made.




++ Stairs

Stairs and stair area ceiling were made.


Saturday, November 1, 2014

A note on 11.01

+ Cleaning land

An excavator, a.k.a. poclaine cleaned land.



++ Windows and doors

Windows and doors were installed.


+++ Wooden floors

Wooden floors were installed and covered with papers.


Thursday, October 30, 2014

A note on 10.31

+ Exterior work

Stucco was applied to the surfaces of the building. Insulation material was attached to the lightweight steel structured walls. Scaffolding was removed.








++ Painting

Inside walls was painted.




+++ Manholes and drain pipes

Manholes for water, electricity, communication were made. Drain pipes were installed.








++++ Epoxy floor

Self-leveling mortar was coated to make the base of the epoxy floor.

Friday, October 24, 2014

A note on 10.24

+ Basement, 1st and 2nd floors

The surfaces of the walls and the ceilings were finished with putty.
The insides of the bathrooms were covered with ceramic tiles and entrance doors were installed.

On the 2nd floor, the kitchen area was prepared, waiting for cabinetry, and a rail for ceiling lightings was installed.