A note on 10.24

+ Basement, 1st and 2nd floors

The surfaces of the walls and the ceilings were finished with putty.
The insides of the bathrooms were covered with ceramic tiles and entrance doors were installed.

On the 2nd floor, the kitchen area was prepared, waiting for cabinetry, and a rail for ceiling lightings was installed.






Posted by dongilkim's blog at 7:14 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Workshop

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Categories

  • Boston (13)
  • Life goes on (2)
  • Memoirs (1)
  • NBSS (88)
  • Projects (9)
  • Workshop (27)

Archives

  • ▼  2014 (27)
    • ►  November (6)
    • ▼  October (7)
      • A note on 10.31
      • A note on 10.24
      • A note on 10.21
      • A note on 10.11
      • A note on 10.09
      • A note on 10.08
      • Building frame
    • ►  September (7)
    • ►  August (7)
  • ►  2013 (27)
    • ►  June (3)
    • ►  May (5)
    • ►  April (6)
    • ►  March (6)
    • ►  February (7)
  • ►  2012 (55)
    • ►  December (5)
    • ►  November (4)
    • ►  October (7)
    • ►  September (4)
    • ►  August (2)
    • ►  July (4)
    • ►  June (3)
    • ►  May (5)
    • ►  April (4)
    • ►  March (6)
    • ►  February (6)
    • ►  January (5)
  • ►  2011 (31)
    • ►  December (4)
    • ►  November (5)
    • ►  October (9)
    • ►  September (8)
    • ►  July (5)

About Me

My photo
dongilkim's blog
View my complete profile

Links

  • dongilkim on facebook
  • dongilkim on tistory
Simple theme. Powered by Blogger.