+ Basement, 1st and 2nd floors
The surfaces of the walls and the ceilings were finished with putty.
The insides of the bathrooms were covered with ceramic tiles and entrance doors were installed.
On the 2nd floor, the kitchen area was prepared, waiting for cabinetry,
and a rail for ceiling lightings was installed.
No comments:
Post a Comment