Friday, September 26, 2014

2nd floor frame: part 2/2

+ Ceiling

The molds for the 2nd floor ceiling were being formed.





++ Finished 2nd floor frame

The molds work was completed and concrete was poured into them. The 2nd floor frame was finished and waited for days for curing.



+++ Workers' shelter

Workers made their shelter at the 1st floor. The styrofoam panels for ceiling insulation were used as their siesta mats.



++++ Daily work record

The site manager recorded daily work progress on his note.
On Sep. 23rd, 4 woodworkers worked on mold work, 1 electrician and 1 installation man worked on piping electrical conduits.