Basement frame: part 3/3

+ Removing H-beams

The H-beams of the shoring system were taken off after 3 days of curing.





++ Completed basement frame

The basement frame was completed.

The sunken area had to be lifted up due to a city regulation. However it could still provide enough lighting. Having two windows and a glass door to the sunken side and three windows to the front side, the basement was well-lighted, IMHO.

The ceiling slab needed two weeks curing, during which the pipes supporting the ceiling slab would be left alone.

inside view of the basement





outside view of the basement