+ Floor heating system
The floor heating system of the 1st floor was finished.
And that of the basement was almost done.
++ Masonry work
The brick wall of the 1st floor was finished.
A masonry worker applied finish plaster on the surface of the concrete sunken wall to prepare a stucco work, while another was about to finish a bathroom.
No comments:
Post a Comment