Wednesday, October 8, 2014

A note on 10.09

+ Floor heating system

The floor heating system of the 1st floor was finished. And that of the basement was almost done.




++ Masonry work

The brick wall of the 1st floor was finished.
A masonry worker applied finish plaster on the surface of the concrete sunken wall to prepare a stucco work, while another was about to finish a bathroom.