Monday, October 20, 2014

A note on 10.21

+ Basement

Wall insulation was going on. A tiny gap was left between concrete wall and insulation. Any moisture created by condensation would drop down in this gap and be displaced though drain system.




++ 1st floor

The balcony side wall was made with bricks, finished with windows and an entry door.



+++ 2nd floor

The ceiling was finished with drywalls or plasterboards.
The kitchen area was prepared with drywalls.






++++ Outside

The outside insulation was covered with wire mesh and cement plaster.
Lightweight steel structure was added to define metal plate walls. A stainless canopy was added to the main entrance.